Wight provided Construction Management for this project that involved transforming a lot with a grassy berm into a synthetic turf field for football, soccer, hockey, and lacrosse. It is equipped with perimeter drainage to maximize play in all weather conditions. There is also a rubberized jogging path, exercise equipment, a long jump pit, and a multi-sport electronic scoreboard. The field is surrounded by decorative metal fence, new sod and trees, new photocell pedestrian lighting, and 70-foot stadium lights. The north end of the field has a brand new concrete pad for a 650-person bleacher system decorated with school- logo windscreens.

UC Woodlawn 06b
UC Woodlawn 08