Reducing traffic congestion through signal & roadway modifications
1/1
Wight was selected by the Illinois Department of Transportation to perform Phase II design services for the reconstruction of .66 miles of Willow Road, from the Des Plaines River to Culligan Parkway. The reconstruction included three 12-foot lanes in each direction with a variable-width median to meet the existing roadway sections east and west of the project limits. The scope of work comprised of roadway alignment, profile, lighting, entrance and exit ramp design, intersection and traffic signal design, roadway signage, maintenance of traffic, and structural oversight.